Prefabricated Restaurant Steel Structure Building High-Rise Construction

Customization: Available
After-sales Service: Technical Support, Installation Instruction
Material: Steel Structure

Product Description

Basic Specifications
Model NO.
Modular Construction
Wind Resistance
Typhoon Level
Earthquake
M6 Resistance
Certification
ISO Certified
Warranty
2 Years
Capacity
50,000 units/Year
HS Code
9406900090
Usage
Warehouse, Villa, Dormitories, Offices, School, Apartment, Hotel
What is MiC (Modular Integrated Construction)?

MiC (Modular Integrated Construction) is an innovative construction method where the building is substantially completed off-site. This significantly reduces on-site processes and enhances site safety, achieving higher productivity.

  • 01. Free-standing integrated modules manufactured in a factory.
  • 02. Modules transported directly to the construction site.
  • 03. Fast installation to form a complete building.

Our Modular Integrated Construction system can be built up to 40 stories high, suitable for schools, hospitals, apartments, and offices.

Three Specialized MIC Series
🏗️

Steel MiC

Formed of structural steel members as the main frame and RC slab as the floor system. Designed for maximum durability and ultimate limit states.

Cycle: 10-15 days production per unit.

🧱

Concrete MiC

High-capacity volumetric concrete production reaching 180,000 sqm annually. Features automatic processing and QSPSC certified labs.

Tech: Dual 120 mixing stations.

🏢

Aluminum MiC

Aluminum structural members for both main frame and decoration. Ideal for mobile houses, residential, and commercial spaces.

Cycle: 10 days production per unit.

Project Gallery & Details
Frequently Asked Questions
What is the maximum height for MiC buildings?
Our Modular Integrated Construction (MiC) system is highly versatile and can be designed for structures reaching up to 40 stories.
What materials are available for the modules?
We offer three main series: Steel MiC for high durability, Concrete MiC for volumetric strength, and Aluminum MiC for lightweight mobile and commercial applications.
How long does the production take?
Production is extremely efficient. Aluminum modules take about 10 days per unit, while Steel modules typically take 10-15 days per unit.
Is the construction resistant to extreme weather?
Yes, our systems are engineered to withstand typhoon-level winds and have an earthquake resistance rating of M6.
What are the primary applications of MiC?
MiC is perfect for a wide range of uses including schools, apartments, hotels, dormitories, hospitals, and temporary office spaces.
Can the design be customized?
Absolutely. All three MiC series can be fully customized according to the specific architectural and functional demands of the client.

Related Products