New Design Fast Assemble Durable Multi Storey Structural Steel Prefab High Rise Commercial Office Building/Hotel Building

Customization: Available
Material: Steel Structure
Wind Resistance: Typhoon

Product Description

Basic Information

Model NO.
Modular Construction
Earthquake Resistance
M6
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop, School, Apartment, Hotel, Transitional Housing
Certification
ISO
Customized
Customized
After-sales Service
Technical Support, Installation Instruction
Warranty
2 years
HS Code
9406900090
Production Capacity
50,000 unit/Year

Product Description

What is MiC?
MiC (Modular Integrated Construction) is an innovative construction method. By using MiC, the building is substantially completed off-site. This can reduce on-site construction processes and enhance site safety, hence achieving higher productivity.

  • Free-standing integrated modules (completed with finishes, fixtures and fittings) manufactured in a factory.
  • Modules transported to construction site.
  • Modules installed to form a building.

Our Modular Integrated Construction system now can be built up to 40 stories. It can be applied to build school, apartment, hospital, dormitory, office building, etc.

Steel MiC

Each steel MiC module is formed of structural steel members as the main frame and RC slab as the floor system. The module frame and connections are designed to fulfill serviceability and ultimate limit states. 10-15 days production cycle per unit.

Concrete MiC

The annual design production capacity of volumetric concrete MiC and non-volumetric components is up to 180,000 square meters. The production plant includes QSPSC certificated laboratory, automatic steel processing lines, and advanced mixing stations.

Aluminum MiC

Each module is formed of aluminum structural members as the main frame. Interior decoration and exterior claddings are also made of aluminum. Ideal for mobile houses up to 4 stories height for residential or commercial usage.

Detailed Photos

Frequently Asked Questions

What are the primary benefits of using Modular Integrated Construction (MiC)?
MiC reduces on-site construction time, enhances site safety, improves productivity, and ensures higher quality control through factory-based manufacturing.
How high can MiC buildings go?
Our modular integrated construction system is designed to build structures up to 40 stories high.
What materials are used in your modular systems?
We offer three main systems: Structural Steel MiC, Concrete MiC, and Aluminum MiC, depending on the project requirements.
What is the typical production cycle for a module?
Depending on the material, the production cycle ranges from 10 days for Aluminum modules to 10-15 days for Steel modules.
Can these modules be customized?
Yes, all modules can be fully customized according to the specific design, size, and layout demands of the client.
What kind of after-sales support do you provide?
We provide comprehensive technical support and detailed installation instructions for all our modular building projects.

Related Products