Smart Modular Housing Solutions for Efficient Global Logistics

Customization: Available
After-sales Service: Online-Technical Support
Application: Apartment

Product Description

Basic Information
Model NO.
ZCTC30001
Installation
Fast Installation
Material
Steel Structure
Earthquake Resistance
Grade 8
Fireproof
Class A
Certification
ISO, CE
Usage
Hotel, House, Office, Villa, Workshop
Specification
5980*2480*2510mm
Production Capacity
5000PCS/Month
Modular Housing
Smart Modular Logistics
Product Description
Folding Box House Detail 1 Folding Box House Detail 2
Product NameFolding Box Houses
MaterialSteel, Sandwich panel
ColorBlue, red, white & customized
Fire proofA1 grade Fire proof
Wind pressureAnti 100km/h
Earthquake grade7 fission activate
ApplicationHotel, Office, Shop, Villa, Warehouse, Workshop
Product Overview
Our Advantages
1

Wide range of application

Designed into various functional units such as office, accommodation, foyer, toilet, kitchen, dining room, clinic, and more.

2

Safe and Durable

Seismic level 8 and wind resistance level 12. Service life is more than 20 years with excellent sound insulation and fire resistance.

3

Industrialization

Unit modules are completed on streamlined production lines with standardized sizes and strict quality control.

4

Easy to Move

Convenient movement adapted to roads, railways, and ships. No dismantling needed for relocation, preserving residual value.

5

Energy Saving

Reduces construction waste by 70% and energy consumption by 50% compared to traditional building modes.

6

Diverse Combinations

Modular units can be stacked in three layers and combined in any length or width direction for flexible design.

Advantage 1
Advantage 2
Process and Quality
Production Process
Quality Control
Worksite 1 Worksite 2
Packaging & Shipping
Shipping Solution
Certifications
Product Certifications
Frequently Asked Questions
1. Can you design a new and unique prefab house for me?
Absolutely! We can provide not only the construction scheme but also landscape design. One-stop service is our primary superiority.
2. What should I provide to build a prefab house?
A sketch drawing is a great reference. If you don't have one, simply notify us of your requirements such as area, usage, and number of stories.
3. How long does it take to build a light steel prefab house?
It depends on the size. Generally, for a 50 square meter house, five workers can finish the installation in 1-3 days.
4. Is it difficult to build a prefab house independently?
Not at all. You can build the house independently according to the construction drawings as long as you know how to use basic electric tools.
5. Can these houses be used for commercial purposes?
Yes, they are versatile and can be used for hotels, offices, schools, entertainment clubs, and light industrial workshops.
6. What is the standard delivery time?
Delivery time depends on order quantities. Generally, it takes between 7-15 days after receiving the deposit.

Related Products