Integrated Tunnel Formwork System for Simultaneous Casting of Concrete Walls and Slabs

Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year

Product Description

🏗️

Tunnel Formwork Overview

Tunnel Formwork Introduction

Introduction: Tunnel formwork is a cutting-edge construction system crafted for simultaneous wall and slab casting in one seamless operation, creating a unified cellular reinforced concrete structure.

This system excels in repetitive building projects like residential apartments, housing complexes, hotels, and dormitories. By merging wall and slab casting, it streamlines construction, cuts labor, minimizes steps, and enables rapid daily concrete pours.

Beyond speed, it delivers high efficiency, consistent short cycles, excellent reusability, and low maintenance costs. Ideal for large residential projects and fast-track builds where time and cost control are crucial.

📋

Basic Specifications

Model NO.Tunnel FormworkCertificationISO, CE
MaterialSteel Q235TypeTunnel Formwork
ColorYellow, Blue or CustomizedAdvantagesEasy, Rapid and Economical
ApplicationHousing, Jail Houses, HostelsProduction Capacity300 Tons / Month
Panel Thickness3.5mmFrame MaterialNo. 6.3 Channel Steel
Secondary Beam63×63 character beamConnecting Plate8mm Thickness

Key Characteristics

01. Dimensional Accuracy Precision molding adheres to specific dimensions outlined in engineering plans.
02. Structural Stability Provides a temporary mold that supports concrete during curing for overall integrity.
03. Construction Efficiency Reduces on-site construction time and potential disruptions significantly.
04. Quality Control Strict measures ensure the structure meets standards for strength and durability.
05. Cost-Effectiveness Lower overall costs due to reduced labor and minimized material wastage.
06. Design Flexibility Fully customizable to accommodate various sizes and project requirements.
📦

Packing & Delivery

Packing Details Loading Process

Logistics Information

  • Loading: Standard container net weight ranges from 22 to 25 tons.
  • Bundles: Used for timber beams, steel props, and tie rods.
  • Pallets/Cases: Small parts are bagged on pallets or in wooden cases.
  • Production Time: Typically 20-30 days post down payment for full containers.
📷

Product Showcase

Formwork Site 1 Formwork Site 2 Formwork Site 3
🛠️

Our Services & Facilities

Production Base Workshop Facilities
Design & Quotation Custom forming & shoring designs per structural drawings using Auto-CAD.
Quality Inspection Advanced production and inspection teams ensure compliance with high standards.
Site Support Remote or on-site guidance to ensure customer satisfaction and ease of installation.
📜

Certifications & Global Presence

Cert 1 Cert 2 Cert 3

Frequently Asked Questions

Are you a factory or trading company?
We are a specialized manufacturing factory with over a decade of industry experience in formwork and scaffolding.
How long is your delivery time?
Typically, delivery is 5-15 days for in-stock items or 15-20 days for custom orders, depending on the quantity.
Do you provide quality guarantees or supervision?
Yes, we provide on-site supervision for most global projects to ensure safety and quality standards are met.
Are samples available for testing?
Yes, we offer samples free of charge; however, the freight cost is covered by the customer.
What information is needed for a design and quotation?
We require structural and sectional drawings of your project to draft a preliminary design and accurate quote.
What materials are used in the Tunnel Formwork system?
The system primarily utilizes high-grade Steel Q235 and No. 6.3 Channel Steel for maximum durability and reuse.

Related Products